As soon as milk arrives at the reception dock, it must be received after thorough checking of the quality for freshness and composition. The layout and design of the dock and equipment should facilitate the reception. Size, shape, capacity and inter-spacing of receiving devices must speed up to complete the reception within 2-3 hours. The conveyor should be long enough so that by the time can reaches to tilting device, the operator must be able to decide for acceptance or rejection of milk after performing the platform tests. Accepted milk must be weighed, recorded,sampled and dumped. Empty cans and tankers should be washed and sanitized and returned to the suppliers.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.